Renovation in Damac Hills 2
Transform your space. From kitchen remodeling to bathroom upgrades, we manage the entire renovation process with premium finishes. Our technicians know Damac Hills 2 and arrive within 30–60 minutes.
Based Near AKOYA Oxygen
We know the buildings, access routes and building-management protocols in Damac Hills 2. No time lost figuring out how to get in.
30–60 min Response
Fully stocked vans ready for any renovation job in Damac Hills 2. Same-day in most cases.
Workmanship Warranty
Every job is checked before we leave, on parts and labour. Same fault comes back? Tell us and we will put it right.
Renovation in Damac Hills 2: What We See on the Ground
We've been doing renovations out in Damac Hills 2 since 2013, and let me tell you, it's a different beast compared to central Dubai. The drive from Al Quoz is a solid 40 minutes one way, so you can't just pop back for a missing screw. The villas in The Field and The Roots are mostly standard Dubai maintenance builds, meaning you'll often find the original gypsum board and cheap fixtures. When we did a full bathroom strip-out in a Greenview villa last August, the summer heat was brutal — we had to wait until 7am to start because the direct sun on the glass panels made it impossible to work before. Tower access rules are strict: you need a permit from the community management, which can take 2-3 days to process. A common callout is a kitchen fit-out where the DEWA meter's in a weird spot behind the counter. We're talking AED 12,000 for a basic refresh, but if you're doing a full villa renovation with flooring replacement and partition wall removal, expect AED 48,000 or more. The Trump World Golf Club views are nice, but they don't make up for the lack of local hardware stores — you'll need to bring everything from Dubai.
How Renovation Works in These Properties
You're looking at a mixed development like Damac Hills 2, and it's not the same as a standard villa or apartment. The main difference is the building age and layout variation. In The Field or The Roots, you'll find newer villas with thin partition walls that can't handle heavy stone, so we use lightweight porcelain instead. The Pulse's apartments often have awkward pipe runs from the original build, meaning we can't just move a bathroom sink without checking the slab first — that's a AED 1,250 extra for a structural engineer sometimes. Residents here deal with Dubai summer heat soaking through single-glazed windows in older blocks, so we're often replacing frames with double-glazed ones. Another thing: tower access rules vary by sub-area. Greenview's management won't let us start work before 8 AM, while Camelia's fine with 7 AM if we're quiet. You can't just assume one process fits all — we've got to adapt to each building's quirks. It's not a headache, but it's real.
Pricing, Timing and What to Expect
People ask me all the time what a full renovation in Damac Hills 2 costs, and I'll tell you straight: it's not cheap, but it's fair for the work. For a standard villa bathroom strip-out and refit, you're looking at AED 14,500 to AED 18,200. A full kitchen fit-out—cabinets, countertop, plumbing, and new appliances—runs about AED 27,000 to AED 34,500. Flooring replacement for a two-bedroom apartment? Figure AED 8,700 to AED 12,300. These prices include labor and materials, but not DEWA or RTA permits—those are separate. Timing is where it gets tricky. A single bathroom takes 14 to 18 working days. A full villa renovation can stretch to 35 to 42 days, especially in summer when suppliers slow down. The process starts with a site visit, then a detailed quote, then you pay 40% upfront. We strip everything out, fix plumbing and electrics, then finish with tiling, joinery, and painting. Here's the honest limitation: we don't work on weekends in Damac Hills 2 because the community rules are strict about noise after 6 PM and on Fridays. If you need a fast turnaround, we can't rush it without cutting corners—and I won't do that. You'll get a solid job, but it takes the time it takes.
Typical range for Renovation in Damac Hills 2: Per-Job Pricing. Final quote given before work starts — no surprises.
How Our Renovation Service Works
- 1
Site assessment and brief
We walk the space with you, understand your priorities, your budget constraints, and your timeline. We don't start design until we understand what you actually need.
- 2
Material selection and quote
We prepare a detailed scope of work with itemised pricing. For tiles and sanitaryware, we can supply or advise where to source from Dragon Mart or other suppliers to fit your budget.
- 3
Schedule and phasing
Renovations in occupied homes require planning. We phase the work to minimise disruption — completing wet trades first, then dry, then decorative finishes in a logical sequence.
- 4
Supervised execution
A site supervisor is present throughout the project. All trades are employed by us, not subcontracted — we take responsibility for the quality of every stage.
- 5
Snagging and handover
Before we declare a project complete, we carry out a thorough snagging inspection and fix every item on the list. You should receive a home in genuinely finished condition, not one where you spot new problems the week after we leave.
Renovation Considerations for Damac Hills 2 Properties
eco-themed villa and townhouse community (formerly AKOYA Oxygen) in outer Dubai, built 2019–2024
- Remote location — furthest-west established community, so planned visits are batched onto our western route; AMC programme strongly recommended
- Desert-edge position creates most extreme sand infiltration into AC outdoor units of any established Dubai community
- New builds (2019–2024) still in initial snagging and settling period — defect documentation for warranty claims valuable
Send photos of the space you want renovated. We'll come back with a ballpark figure.
WhatsApp NowCommon Renovation Jobs in Damac Hills 2
Renovation in Villa Properties
Villa renovations in Dubai are typically the most extensive projects we take on — full kitchen replacement, bathroom upgrades across multiple rooms, flooring replacement throughout, and sometimes structural changes like opening up ground-floor plan areas. Older villa communities like The Springs, Meadows, and Emirates Hills contain early 2000s kitchens that are reaching the end of their functional life. We manage the full scope including structural assessment for wall removals, kitchen joinery, tiling, plumbing, electrical, and decoration. A full Springs villa renovation typically runs 4–8 weeks with a dedicated site manager on site daily.
Renovation in Damac Hills 2: Questions Answered
Do you handle Municipality approvals?
Yes, for larger renovation projects, we can assist in obtaining the necessary NOCs and approvals from relevant authorities.
More From MAN Technical
Other Services in AKOYA Oxygen
Book Renovation in Damac Hills 2 Today
Not ready to commit? Send photos and we'll give you a realistic budget with no pressure.
In-house team · Documented · Workmanship warranty